There follows an approximate timeline of events in the history of Portland cement production in Britain. Suggestions and corrections are welcome!
1842: Rotherhithe commenced operation.
1845: Swanscombe commenced operation.
1846: Robins commenced operation and Rotherhithe shut down.
1851: Crown (Frindsbury) commenced operation.
1852: Vectis, Faversham, Gateshead, Ashby's and Borstal Court commenced operation.
1853: Bevans, Wakefield and Wouldham Court commenced operation.
1854: Cliffe Creek, Lees, Elmley and Burham commenced operation.
1855: Maidstone, Weekes and Seacombe commenced operation.
1856: Dovercourt and Ouseburn commenced operation.
1857: Dolphin, Ouseburn and Warren commenced operation.
1858: Sittingbourne and Strood Dock commenced operation.
1859: Upnor commenced operation and Wouldham Court temporarily ceased operation.
1860: Maidstone shut down and Millwall commenced operation.
1861: Bishop Saltings commenced operation.
1862: Whitewall commenced operation.
1863: Wouldham Court restarted.
1864: Bishop Saltings shut down. Teynham, Northam and Harbury commenced operation.
1865: Berney Arms, North Hylton, Sunderland, Waldringfield and Wareham commenced operation.
1866: Cliff House and Hollicks commenced operation.
1867: Britannia Wharf, Nine Elms and South Hylton commenced operation.
1868: Down End, London Portland and Millbank Wharf commenced operation.
1869: Barrow, Deepfields, Wallsend and Ysceifiog commenced operation.
1870: Willington, Hebburn, Paradise, Peters and Rugby commenced operation.
1871: Dunball, Grays and Union commenced operation.
1872: Burgh Castle, Deptford, Folkestone, Stockton and Thames commenced operation.
1873: Dove Holes and Tower commenced operation.
1874: Aylesford, Afonwen, Ayres Quay, Cliffe Quarry, Gillingham, Newbold, West Thurrock, Westons and Wouldham commenced operation.
1875: Crown (Northfleet), Prestatyn, Southam and Wilmington commenced operation.
1876: Jarrow commenced operation.
1877: Calder Vale, Johnsons, Phoenix and West Kent commenced operation. Prestatyn shut down.
1878: Adamant, Halling Manor and South Durham commenced operation.
1879: Albion, Britannia, Clitheroe and Saffron Walden commenced operation. Millwall and Strood Dock shut down.
1880: Beehive, Crown Quay, Globe, Harefield, Maes-y-coed and Monkwearmouth commenced operation. Berney Arms shut down.
1881: Forth Banks, Martin Earles and Rainham commenced operation.
1882: Brading, Falcon and Queenborough commenced operation.
1883: Arlesey, Cuxton and Shoreham commenced operation.
1884: Beaver, Standard and Newhaven commenced operation.
1885: The first rotary kiln, Barnstone A1 underwent its failed trial. Bridge and Lyme Regis commenced operation. Mitcheldean A1, the second rotary kiln, underwent its failed trial.
1886: Barnstone and Oldbury commenced operation. Cliffe Creek shut down.
1887: Sunderland shut down.
1888: Romsey Town commenced operation. Third rotary kiln Arlesey A1 commenced its failed trial.
1889: At Penarth rotary kiln A1 failed to operate, but static kilns commenced operation. Ditton, Greenhithe, Quarry and Stoneferry commenced operation. Maes-y-coed shut down.
1890: Artillery and Much Wenlock commenced operation. Dolphin temporarily ceased operation. Dove Holes and Monkwearmouth shut down.
1891: Borstal Manor, Cam Blue Lias and Shield commenced operation. Ayres Quay, Folkestone and Seacombe shut down.
1892: East Anglian commenced operation. Britannia Wharf, Down End and Millbank Wharf shut down. Standard temporarily ceased operation. Penarth A2 failed to operate.
1893: Dartford and Rhee Valley commenced operation. Burgh Castle shut down.
1894: Bridgwater, Isis, Llandaff Yard, Mitcheldean and Spinx commenced operation. Standard restarted. Calder Vale, Forth Banks, Ysceifiog and Wakefield shut down. Brading temporarily ceased operation.
1895: Barhams and Hauxton commenced operation. Dolphin restarted. Paradise, South Durham and Wallsend shut down.
1896: Bottisham Lode and Red Lion commenced operation. Artillery and Standard temporarily ceased operation. Ditton shut down.
1897: Barton commenced operation and Adamant shut down.
1898: Imperial, Meldreth and Premier commenced operation. Standard restarted. Hollicks shut down.
1899: Sundon and Burwell commenced operation. Crown Quay and Llandaff Yard shut down.
May 1900: Pylle commenced operation and Artillery restarted.
July 1900: Flotation of APCM, merging 24 companies.
August 1900: Nine Elms and Tower shut down.
September 1900: Hartlepools commenced operation.
December 1900: The first successful British rotary kiln - Martin Earles A1 - commenced operation.
February 1901: Rotary kilns A1 and A2 at Shoreham commenced operation.
March 1901: The first four rotary kilns at Swanscombe - Kilns A1-A4 - commenced operation.
April 1901: Swanscombe A5 commenced operation. Saxon commenced operation. Bridge, Elmley and Globe shut down, and Borstal Court temporarily ceased operation.
May 1901: Swanscombe A6 commenced operation.
June 1901: Swanscombe A7 commenced operation.
August 1901: Swanscombe A8 commenced operation, and Nos 1 & 2 Ransome kilns at Penarth were commissioned with coal firing.
September 1901: Swanscombe A9 and Wouldham A1 & A2 commenced operation.
October 1901: Wouldham A3 & A4 commenced operation.
November 1901: Swanscombe A10 and Wouldham A5 commenced operation.
December 1901: Wouldham A6 commenced operation, completing their rotary kiln installation.
January 1902: Swanscombe A11 & A12 commenced operation.
February 1902: Swanscombe A13 commenced operation.
April 1902: Swanscombe A14 commenced operation.
May 1902: Swanscombe A15 commenced operation.
June 1902: Swanscombe A16 commenced operation, completing their rotary kiln installation.
July 1902: Britannia, Crown (Northfleet), Cuxton, Rainham, Sharp's Green, Upnor and Westons shut down.
October 1902: Newhaven A1 commenced operation.
March 1903: Arlesey B1 commenced operation.
April 1903: Lewes commenced operation. Faversham, Hauxton, Northam and Wouldham Court shut down, and Bottisham Lode temporarily ceased operation.
May 1903: Arlesey B2 commenced operation.
June 1903: Martin Earles B1-B4 commenced operation.
August 1903: Stoneferry A1 commenced operation.
September 1903: Stoneferry A2 and Martin Earles B5-B8 commenced operation.
December 1903: Martin Earles B9 commenced operation.
January 1904: Martin Earles B10-B12 commenced operation and A1 shut down.
March 1904: Martin Earles B13-B16 commenced operation, completing their rotary kiln installation.
April 1904: Standard shut down.
May 1904: Cousland commenced operation.
August 1904: Billingham A1-A4 and Bevans A1-A6 commenced operation. The static kilns at Swanscombe shut down.
September 1904: Bevans A7 & A8 and Norman A1-A5 commenced operation.
November 1904: Warren A1 commenced operation.
March 1905: Hartlepools shut down.
April 1905: Mitcheldean static kilns shut down.
June 1905: West Kent A1 commenced operation.
July 1905: Beddington A1 and Bevans A9 & A10 commenced operation. Aylesford shut down.
August 1905: Beddington A2 and West Kent A2 commenced operation.
October 1905: Warren A2 commenced operation.
November 1905: Brading restarted. The first stage of uprating the Swanscombe rotary kilns commenced with the start of a lengthened kiln A16.
December 1905: Sundon A1 commenced operation. Swanscombe A11-A15 were uprated.
February 1906: Swanscombe A7-A10 were uprated.
March 1906: Bevans A1 & A2 were uprated by lengthening. Teynham shut down.
May 1906: Bevans A3 & A4 and Swanscombe A5 & A6 were uprated.
June 1906: Atlas commenced operation. Bevans A5 & A6 and Swanscombe A1-A4 were uprated.
July 1906: Stoneferry A3 commenced operation. Bevans A7 & A8 were uprated. Dovercourt and Warren static kilns were shut down.
October 1906: Wilmington A1 & A2 commenced operation.
January 1907: In the second round of uprating at Swanscombe, A16 was lengthened.
February 1907: Mitcheldean B1 commenced operation. Swanscombe A15 was uprated.
March 1907: Swanscombe A14 was uprated.
April 1907: Johnsons A1-A3 and Newhaven A2 commenced operation. Swanscombe A13 was uprated.
May 1907: Swanscombe A11 & A12 were uprated.
June 1907: Kirtlington A1 commenced operation.
July 1907: West Kent A3 commenced operation. Swanscombe A8-A10 were uprated. Phoenix and the Bevans static kilns were shut down.
August 1907: Swanscombe A6 & A7 were uprated.
September 1907: Swanscombe A1-A5 were uprated.
October 1907: Wouldham A1-A4 and A6 were uprated.
November 1907: Beaver, Beehive, Crown (Frindsbury) and Quarry merged, and functioned thereafter as Crown & Quarry.
December 1907: Crosfield A1 commenced operation. Waldringfield shut down.
January 1908: Premier A1 commenced operation. Arlesey B1 & B2 were uprated by lengthening.
February 1908: Premier static kilns shut down.
March 1908: Wouldham A5 was uprated.
April 1908: Atlas, Meldreth and Newhaven A1 shut down.
May 1908: Jarrow A1 commenced operation.
July 1908: Southam A1 & A2 commenced operation and the static kilns shut down. Bottisham Lode restarted.
August 1908: Wouldham A1, A2 and A6 were uprated.
October 1908: Wouldham A5 was uprated.
December 1908: London Portland shut down.
March 1909: Thames temporarily ceased operation.
May 1909: Harefield A1 commenced operation.
July 1909: Linley, Harbury A1 and Sundon A2 commenced operation. Deptford and Whitewall shut down.
June 1910: Stockton A1 commenced operation.
July 1910: Wouldham A7 & A8 commenced operation. Much Wenlock and Robins shut down and Newbold temporarily ceased operation.
January 1911: Rugby A1 commenced operation.
April 1911: West Thurrock static kilns shut down.
August 1911: North Hylton shut down.
October 1911: Shoreham A3 commenced operation. Wouldham static kilns shut down.
November 1911: Peters A1 commenced operation.
December 1911: Barton A1 and West Kent A4 commenced operation. Borstal Manor and Gillingham temporarily ceased operation. Union and West Kent static kilns shut down. BPCM launched, merging 33 companies.
January 1912: Wouldham A9 commenced operation. The Stoneferry static kilns, Norman A1 & A2 and Penarth A1 & A2 were all shut down. Shoreham A1 & A2 temporarily ceased operation.
February 1912: Dartford shut down. Swanscombe A1 was shut down and converted into a coal dryer.
March 1912: Queenborough and Willington shut down. Swanscombe A2 was shut down and converted into a coal dryer.
April 1912: Burham A1 commenced operation.
June 1912: Burham A2 and Lyme Regis A1 commenced operation. Cliff House shut down. Martin Earles B1-B6 temporarily ceased operation.
July 1912: Harbury A2 commenced operation and their static kilns shut down. Pylle shut down.
August 1912: Burham A3 commenced operation.
December 1912: Ellesmere Port A1 commenced operation.
January 1913: Ellesmere Port A2 commenced operation. Sharp's Green shut down.
March 1913: Bevans A11 and West Thurrock A1 commenced operation.
April 1913: Burham A2 and Rhoose A1 commenced operation.
May 1913: Peters A2, Wilmington A3 and Johnsons A4 commenced operation.
June 1913: Vectis A1 commenced operation. Arlesey B1 was uprated.
July 1913: Bevans A12, Southam A3, Rochester A1 and Stockton A2 commenced operation. Arlesey B2 was uprated. Premier A1 and Saxon temporarily ceased operation. Stockton static kilns shut down.
August 1913: Barton static kilns shut down.
September 1913: British Standard A1 commenced operation.
October 1913: Masons A1 and West Thurrock A2 commenced operation.
November 1913: Norman A3-A5 temporarily ceased operation.
January 1914: Penarth B1 commenced operation.
February 1914: Ellesmere Port A3 commenced operation. Falcon shut down.
March 1914: Droylsden and Burham A3 commenced operation.
May 1914: Aberthaw A1 & A2 commenced operation.
June 1914: Barnstone A2 commenced operation.
July 1914: Cliffe A1 and Coltness A1 commenced operation.
August 1914: Rochester A2 commenced operation. Afonwen, Bridgwater and the static kilns of Harefield and Jarrow were all shut down. Shield temporarily ceased operation.
September 1914: Warren A3 commenced operation. Deepfields, Lyme Regis and the static kilns of Johnsons and Martin Earles were all shut down. Cliffe Quarry, Greenhithe, Albion, Artillery, Imperial, Red Lion and Martin Earles kilns B7-B9 all temporarily ceased operation.
October 1914: Rugby static kilns shut down. Crosfield A1 temporarily ceased operation.
January 1915: Rugby A2 commenced operation. Hebburn and South Hylton shut down.
February 1915: Romsey Town shut down. Brading temporarily ceased operation.
March 1915: Warren A1-A3 temporarily ceased operation.
May 1915: Wilmington static kilns shut down.
July 1915: Gillingham and Premier A1 restarted. Mitcheldean B1 shut down. Grays and Lees temporarily ceased operation.
August 1915: West Kent A1-A4 temporarily ceased operation.
September 1915: Weekes temporarily ceased operation.
October 1915: Southam A1 & A2 temporarily ceased operation.
1916: Bevans A9 & A10 were uprated. Martin Earles B10 temporarily ceased operation.
1917: Aberthaw A3 commenced operation. Oldbury shut down.
1918: Wishaw A1 commenced operation. Lees, Warren A1-A3 and Crosfield A1 restarted. Saffron Walden temporarily ceased operation.
January 1919: Wishaw A2 commenced operation.
February 1919: Norman A3-A5 restarted.
March 1919: Saxon restarted.
April 1919: Southam A1 & A2 restarted.
May 1919: West Kent A4 restarted.
June 1919: West Kent A1-A3 restarted.
July 1919: Cliffe Quarry and Grays restarted.
August 1919: Borstal Court and Greenhithe restarted.
September 1919: Thames restarted.
October 1919: Shield and Shoreham A1 & A2 restarted.
November 1919: Crosfield A2 commenced operation. Albion restarted.
December 1919: Artillery and Borstal Manor restarted.
January 1920: Bottisham Lode shut down.
February 1920: Imperial restarted.
April 1920: Burham A4 commenced operation.
June 1920: Coltness A2 commenced operation.
September 1920: Wilmington A4 commenced operation.
October 1920: Kirton Lindsey A1 commenced operation.
?Month 1920: Brading, Martin Earles B1-B10, Newbold, Red Lion and Weekes restarted.
May 1921: Bevans A1-A4 shut down.
October 1921: Bevans A5-A8 shut down.
November 1921: Ellesmere Port A4 commenced operation.
December 1921: Humber A1 commenced operation. Bevans A9-A12 shut down.
?Month 1921: Chinnor B1 and Johnsons A5 commenced operation. Saffron Walden restarted. Borstal Court, Borstal Manor, Cliffe Quarry, Clitheroe, Johnsons A1-A3, Thames and Weekes shut down.
January 1922: Humber A2 and Kent A1 commenced operation.
February 1922: Kent A2 commenced operation.
September 1922: Ellesmere Port A5 commenced operation.
?Month 1922: Norman B1 and Martin Earles C1 commenced operation. Albion, Artillery, Grays, Greenhithe, Imperial, Martin Earles B1-B16, Norman A3-A5, Peters static kilns, Red Lion, Shield, Shoreham A1 & A2 and Wareham shut down.
January 1923: Rhoose A2 commenced operation.
November 1923: Vectis A1 was uprated by lengthening.
December 1923: West Thurrock A3 commenced operation.
?Month 1923: British Standard A2 and Masons A2 commenced operation. Jarrow A1 and Newbold shut down.
May 1924: Billingham A1-A4 were uprated by lengthening.
December 1924: Holborough A1 and Kirton Lindsey A2 commenced operation. Swanscombe A3 shut down.
?Month 1924: Cliffe A2 and Harbury A3 commenced operation. Harbury A1 & A2 were uprated by lengthening. Cousland, Gateshead, Newhaven A2 and static kilns, Saffron Walden and West Kent A1-A3 shut down.
February 1925: Holborough A2 commenced operation.
April 1925: Brading temporarily ceased operation.
June 1925: Humber A3 commenced operation.
December 1925: West Kent A4 shut down.
?Month 1925: Crown & Quarry static kilns and Lees shut down.
January 1926: Martin Earles C2 commenced operation.
March 1926: Bevans B1 and Crown & Quarry A1 commenced operation. Brading restarted.
May 1926: Sittingbourne A1 commenced operation and the static kilns shut down.
June 1926: Bevans B2 commenced operation.
August 1926: Bevans B3 commenced operation. Bevans became Britain's largest plant.
September 1926: Dunstable A1 & A2 commenced operation.
December 1926: Gillingham A1 commenced operation. Gillingham static kilns and Brading shut down.
?Month 1926: Holborough A3 and Rugby A3 commenced operation. Arlesey static kilns, Ashby's, Cam Blue Lias, Coltness A1, Rugby A1 and Vectis static kilns shut down.
July 1927: Barrington A1 and Ellesmere Port A6 commenced operation.
September 1927: Sittingbourne A2 commenced operation.
October 1927: Billingham B1 commenced operation.
December 1927: Barton A1 shut down.
Month? 1927: Barnstone B1 commenced operation. Burham, Penarth, Saxon and Shoreham static kilns shut down. Stoneferry A1-A3 shut down.
January 1928: Lewes A1 and Bevans B4 commenced operation. Lewes static kilns shut down.
May 1928: Halling Manor and Premier A1 shut down.
June 1928: Swanscombe A4 shut down.
September 1928: Chinnor A1 commenced operation.
November 1928: Swanscombe A5 shut down.
?Month 1928: Johnsons A6 & A7 and Sundon A3 commenced operation. Peters A1 & A2, shut down, Sundon A1 and their static kilns shut down.
January 1929: Oxford A1 & A2 commenced operation. Kirtlington A1 and Swanscombe A6 shut down.
March 1929: West Thurrock A4 commenced operation.
April 1929: Swanscombe A7 shut down.
June 1929: Swanscombe B1 commenced operation and A14-A16 shut down.
July 1929: Swanscombe B2 & B3 commenced operation. Harefield A1 and Swanscombe A8-A13 shut down.
August 1929: Ketton A1 and Billingham B2 commenced operation.
September 1929: Billingham A1-A4 shut down.
November 1929: Hope A1 & A2 commenced operation.
December 1929: Crosfield A1 & A2 and Wouldham A1-A6 shut down.
?Month 1929: Beddington A1 & A2 were modified for white production. British Standard A1, Ellesmere Port A1-A3 and Isis shut down.
January 1930: Wouldham A10 commenced operation.
October 1930: Burham A4 shut down and A1-A3 temporarily ceased operation.
?Month 1930: With uprating of its capacity, Johnsons became the largest British plant, and the first to have more than 0.5m tpa of clinker capacity.
January 1931: Rhee Valley shut down.
May 1931: West Thurrock A5 commenced operation. Billingham S1 commenced effective operation, marking the start of Anhydrite Process production.
December 1931: British Standard A2 and Ellesmere Port A6 shut down. Crown & Quarry A1 and Martin Earles C1 & C2 temporarily ceased operation.
Month? 1931: Barrington A2 commenced operation. Chinnor static kilns, Shoreham A3 and Warren A1 shut down.
January 1932: Ellesmere Port A5 shut down.
March 1932: Ellesmere Port A4 shut down.
October 1932: Rodmell A1 commenced operation.
?Month 1932: Swanscombe S1 & S2 commenced operation. Humber A1 & A2 were uprated with enlarged burning zones. Arlesey B1 & B2, Burwell and Harbury A1 shut down.
April 1933: Kent A1 & A2 temporarily ceased operation.
October 1933: Shoreham C3 and Ketton A2 commenced operation.
?Month 1933: Harbury B1 and Oxford B1 commenced operation. Oxford A2 was uprated with a calcinator. Beddington A1 & A2 and Oxford A1 shut down.
March 1934: Kent A1 & A2, Martin Earles C1 & C2 and Crown & Quarry A1 restarted.
June 1934: Burham A1-A3 re-started.
September 1934: Coltness A2 was uprated.
October 1934: West Thurrock A6 commenced operation. West Thurrock thereby became Britain's biggest plant, and remained so for 30 years.
November 1934: Burham A1-A3 temporarily ceased operation.
?Month 1934: Chinnor A1 was uprated by addition of a calcinator. Barhams and East Anglian shut down.
January 1935: Billingham S2 commenced operation.
April 1935: Hope A3 commenced operation.
September 1935: Swanscombe B4 commenced operation.
December 1935: Crown & Quarry A1 temporarily ceased operation.
?Month 1935: Oxford B3 commenced operation. Rodmell A1 was uprated with a calcinator. Barrow and Linley shut down.
January 1936: Lewes A1 was uprated by lengthening.
February 1936: Crown & Quarry A1 re-started.
June 1936: Burham A1-A3 restarted.
July 1936: Crown & Quarry A2 commenced operation.
November 1936: Ribblesdale A1 commenced operation.
?Month 1936: Cliffe B3 and Kirton Lindsey A3 commenced operation. Cliffe A2 was uprated with a calcinator. Barnstone A2, Cliffe A1, Harbury A2 and Warren A2 shut down.
March 1937: Metropolitan A1 commenced operation.
June 1937: West Thurrock A7 commenced operation.
July 1937: Chinnor A2 and Metropolitan A2 commenced operation.
September 1937: Ribblesdale A2 and Pitstone A1 commenced operation.
October 1937: Southam A4 commenced operation.
December 1937: Gillingham A1 shut down.
?Month 1937: Barnstone B2, Dunstable A3, Harbury B2, Kirton Lindsey A4, Swanscombe S3 and Wouldham A11 commenced operation. Aberthaw A1 & A2 were uprated with slurry dryers. Dunstable A1 & A2 were uprated with enlarged backends. Barnstone static kilns and Southam A1 & A2 shut down. Wouldham A7 & A8 temporarily ceased operation.
February 1938: Southam A5 commenced operation.
May 1938: Rochester A3 and South Ferriby A1 commenced operation.
July 1938: Rochester A2 temporarily ceased operation.
August 1938: Burham A1-A3 shut down.
?Month 1938: Cliffe B1, Holborough A4, Hope A4, Kent A3 and Metropolitan A3 commenced operation. Holborough A1 was uprated with a desiccator. Rochester A1 shut down.
March 1939: Ketton A3 commenced operation.
May 1939: Warren A3 shut down.
September 1939: Crown & Quarry A1 & A2 and Swanscombe S1 & S2 temporarily ceased operation. Droylsden shut down.
?Month 1939: Kent A4 and Masons A3 commenced operation. Rugby A2 shut down.
?Month 1940: Rugby A4 commenced operation. Martin Earles C1 & C2 and Swanscombe S3 temporarily ceased operation.
?Month 1941: Dunball shut down.
?Month 1942: Spinx - with the last functioning bottle kilns - shut down.
?Month 1944: Penarth B1 temporarily ceased operation. Dolphin - with the last functioning chamber kilns - and Vectis A1 shut down.
May 1945: Stockton A1 & A2 shut down.
?Month 1946: Crown & Quarry A2, Penarth B1 and Swanscombe S2 & S3 restarted. Barrington A1 & A2 were uprated by adding desiccators.
December 1947: West Thurrock A2 shut down.
?Month 1947: Crown & Quarry A1 and Swanscombe S1 restarted.
June 1948: West Thurrock A1 shut down.
?Month 1948: Martin Earles C2 restarted. Dunstable A1 was uprated by lengthening.
February 1949: West Thurrock B2 commenced operation.
August 1949: Norman B1 shut down and C1 commenced operation.
December 1949: Padeswood A2 commenced operation.
?Month 1949: Swanscombe S4 commenced operation.
April 1950: Padeswood A1 commenced operation.
June 1950: Rochester A4 commenced operation.
January 1951: Shoreham C1 commenced operation.
February 1951: Shoreham C2 commenced operation.
July 1951: Ribblesdale A3 commenced operation.
?Month 1951: West Thurrock A3 shut down.
March 1952: Pitstone A2 commenced operation.
December 1952: West Thurrock B3 commenced operation.
?Month 1952: Martin Earles C1, Rochester A2 and Wouldham A7 & A8 restarted. Metropolitan A1 shut down.
April 1953: Hope A5 commenced operation: Hope became Blue Circle's biggest plant.
June 1953: Masons A4 commenced operation.
December 1953: Rugby A5 commenced operation.
?Month 1953: Dunstable A3 was uprated by lengthening.
February 1954: Plymstock static kiln commenced operation.
June 1954: Ketton A4 commenced operation.
November 1954: Pitstone A3 commenced operation.
December 1954: Billingham S3 commenced operation.
?Month 1954: South Ferriby static kiln commenced operation.
April 1955: Widnes A1 commenced operation.
July 1955: Widnes A2 commenced operation.
November 1955: Whitehaven A1 commenced operation.
December 1955: Whitehaven A2 commenced operation.
?Month 1955: Rochester A5 commenced operation. Shoreham C3 was uprated with a Berz preheater.
April 1956: Barrington A3 commenced operation.
?Month 1956: Rochester A2 shut down.
April 1957: Cauldon A1 commenced operation.
May 1957: Southam A6 commenced operation and A3 shut down.
?Month 1957: Cliffe A2 & B1 were uprated by removal of calcinators. Pitstone A1 was modified for white production. Wouldham A7 & A8 temporarily ceased operation.
January 1958: Chinnor A3 commenced operation.
?Month 1958: Aberthaw A4 commenced operation. Swanscombe B1 converted for white production and S1 & S2 temporarily ceased operation.
May 1959: West Thurrock A8 commenced operation, and West Thurrock became the first British plant with clinker capacity over 1m tpa.
September 1959: Bevans B1 was uprated by addition of a Davis preheater.
December 1959: Wouldham A7 restarted.
?Month 1959: Coltness A2 shut down.
January 1960: Wouldham A8 restarted.
August 1960: Cauldon A2 commenced operation.
?Month 1960: Swanscombe S1 & S2 restarted. West Thurrock A6 shut down.
January 1961: Chinnor A1 shut down.
May 1961: Ribblesdale A4 commenced operation.
September 1961: Chinnor B1 and Plymstock A1 commenced operation and the static kilns shut down.
November 1961: Southam A7 commenced operation.
?Month 1961: West Thurrock B6 commenced operation.
May 1962: Whitehaven A3 and Ketton A5 commenced operation.
June 1962: Wouldham A8 temporarily ceased operation.
July 1962: Wouldham A7 temporarily ceased operation.
August 1962: Cauldon A3 commenced operation.
September 1962: Westbury A1 commenced operation.
December 1962: Wishaw A1 & A2 shut down.
?Month 1962: West Thurrock B1 commenced operation. Swanscombe S3 & S4 temporarily ceased operation.
March 1963: Crown & Quarry A1 & A2 shut down.
April 1963: Dunbar A1 & A2 commenced operation.
October 1963: Rhoose A3 commenced operation.
November 1963: Pitstone A4 commenced operation.
May 1964: Barrington A4 commenced operation.
?Month 1964: Swanscombe S3 & S4 restarted.
June 1965: Weardale A1 and Westbury A2 commenced operation. Wouldham A7 & A8 restarted.
October 1965: Weardale A2 commenced operation.
June 1966: Swanscombe S1 shut down.
August 1966: Dunstable A4 commenced operation. Swanscombe S2 shut down.
September 1966: Masons A5 and Dunbar A3 commenced operation. Masons A4 temporarily ceased operation and A1-A3 shut down.
November 1966: Wouldham A7 & A8 shut down.
December 1966: Plymstock A2 commenced operation. Johnsons A4 & A5 shut down.
?Month 1966: Padeswood A3 and Tunstead A1 commenced operation. Padeswood A1 was uprated with and enlarged burning zone. South Ferriby static kiln shut down.
January 1967: Whitehaven A4 commenced operation. Shoreham C3 and Kirton Lindsey A1 & A2 shut down.
February 1967: Ketton A6 commenced operation.
May 1967: Whitehaven A5 commenced operation.
September 1967: South Ferriby A1 and Martin Earles C1 & C2 shut down.
October 1967: Ribblesdale A5 and South Ferriby A2 commenced operation.
November 1967: Bevans B1 shut down.
?Month 1967: Aberthaw A5 commenced operation and A1 & A2 shut down.
June 1968: Rugby A6 commenced operation and A3 temporarily ceased operation.
October 1968: Kirton Lindsey A5 commenced operation.
June 1969: Masons A4 restarted.
July 1969: Wilmington A1 & A2 shut down.
September 1969: Penarth B1 shut down.
December 1969: Wilmington A3 & A4 shut down.
?Month 1969: Ribblesdale A3 was uprated by lengthening. Aberthaw A3 & A4 temporarily ceased operation. Barnstone B1 & B2 and Cliffe B1 shut down.
January 1970: Pitstone A5 commenced operation. Cliffe A2 & B3 shut down.
February 1970: Northfleet A1 commenced operation.
April 1970: Hope B1 commenced operation. Billingham S1, Kent A1-A4 and Metropolitan A2 & A3 shut down.
May 1970: Northfleet A2 and Hope B2 commenced operation, and A1-A5 shut down.
June 1970: Dunstable A1-A3 shut down.
July 1970: Swanscombe S4 temporarily ceased operation. Billingham B1 & S2 shut down.
August 1970: Swanscombe S3 temporarily ceased operation.
October 1970: Billingham S3 shut down.
November 1970: Bevans B2-B4 and Sittingbourne A1 & A2 shut down.
December 1970: Northfleet A3 commenced operation: Northfleet became Britain's biggest plant. Billingham B2 and Harbury B1, B2 & A3 shut down.
February 1971: West Thurrock A4 & A5 shut down.
March 1971: Northfleet A4 commenced operation. Johnsons A6 & A7 and Dunstable A4 shut down.
July 1971: Northfleet A5 commenced operation.
December 1971: Northfleet A6 commenced operation.
January 1972: Aberthaw A4 restarted.
March 1972: Wouldham A11 temporarily ceased operation.
?Month 1972: Aberthaw A3 restarted. Pitstone A1 converted to grey.
January 1973: Widnes A1 & A2 shut down.
March 1973: Whitehaven A1 shut down.
April 1973: Whitehaven A2 shut down.
June 1973: Wouldham A9 temporarily ceased operation.
?Month 1973: Calcinators were removed from Oxford A2 & B3.
July 1974: Wouldham A11 restarted.
August 1974: Wouldham A10 shut down.
October 1974: Masons A4 shut down.
January 1975: Oxford B1, West Thurrock B2 & B3 and Rodmell A1 shut down.
March 1975: Oxford B3 shut down.
April 1975: Aberthaw A6 commenced operation. West Thurrock A7, B1 & B6 shut down.
August 1975: Wouldham A9 restarted.
November 1975: Whitehaven A3 shut down.
?Month 1975: Swanscombe S3 & S4 restarted. Aberthaw A3 & A4 and Rhoose A1 & A2 shut down.
March 1976: Wouldham A9 and Kirton Lindsey A4 shut down.
April 1976: West Thurrock A8 shut down.
May 1976: Whitehaven A4 & A5 shut down, marking the end of Anhydrite Process production.
July 1976: Ribblesdale A6 commenced operation. Swanscombe S3 & S4 and Sundon A2 shut down.
August 1976: Wouldham A11 shut down.
September 1976: Kirton Lindsey A3 shut down.
November 1976: Sundon A3 shut down.
December 1976: Kirton Lindsey A5 shut down.
November 1977: Ketton A7 commenced operation. Rugby A3 was uprated by lengthening. Southam A6 was uprated with a Lepol grate.
December 1977: Southam A4 shut down.
?Month 1978: South Ferriby A3 commenced operation.
May 1979: Pitstone A3 temporarily ceased operation, and A1 & A2 shut down.
?Month 1979: Rhoose A3 shut down.
April 1980: Rochester A6 commenced operation, and A3-A5 shut down.
October 1980: Rugby A3 shut down.
November 1980: Humber A2 shut down.
?Month 1980: Pitstone A5 was uprated with a second preheater stage.
January 1981: Rugby A4 and Northfleet A3 shut down.
February 1981: Northfleet A1 shut down.
March 1981: Swanscombe B2 & B3 temporarily ceased operation and B4 shut down.
July 1981: Lewes A1 shut down.
September 1981: Humber A1 & A3 shut down.
October 1981: Plymstock A1 shut down.
January 1982: Southam A5 shut down.
April 1982: Southam A7 was uprated with a semi-wet crusher/dryer/cyclone preheater.
July 1982: Rugby A5 shut down.
?Month 1982: Holborough A4 and Ribblesdale A1 shut down.
March 1983: Ribblesdale A7 commenced operation.
April 1983: Ribblesdale A2 & A3 shut down.
June 1983: Shoreham C2 converted to semi-wet operation.
July 1983: Shoreham C1 converted to semi-wet operation.
August 1983: Northfleet A5 shut down.
September 1983: Northfleet A2 converted to semi-wet operation.
October 1983: Northfleet A4 converted to semi-wet operation. Cauldon A3 shut down.
June 1984: Norman C1 shut down.
August 1984: Swanscombe B2 & B3 restarted.
October 1984: Holborough A1-A3 shut down.
September 1985: Cauldon B1 commenced operation.
October 1985: Cauldon A1 & A2 shut down.
April 1986: Dunbar A3 was converted to precalciner operation.
May 1986: Dunbar A1 & A2 shut down.
October 1986: Ketton A8 commenced operation.
December 1986: Ketton A1-A4 shut down.
April 1987: Aberthaw A5 shut down.
June 1987: Pitstone A3 restarted.
December 1987: Ketton A5 & A6 shut down.
?Month 1987: Oxford A2 shut down.
November 1990: Swanscombe B2 shut down.
December 1990: Swanscombe B1 & B3 shut down.
?Month 1990: Pitstone A3 & A4 shut down.
February 1991: Shoreham C1 shut down.
April 1991: Shoreham C2 shut down.
August 1991: Pitstone A5 shut down.
?Month 1991: Barrington A1-A3 and Northfleet A6 shut down. Padeswood A1 & A2 temporarily ceased operation.
June 1992: Northfleet A4 temporarily ceased operation.
?Month 1992: Ribblesdale A4 shut down.
April 1994: Northfleet A4 restarted.
?Month 1995: Padeswood A1 and A2 restarted.
January 1999: Chinnor B1, A2 & A3 shut down.
February 1999: Masons A5 shut down.
May 1999: Plymstock A2 shut down.
February 2000: Rugby A7 commenced operation. Rochester A6, Rugby A6 and Southam A6 & A7 shut down.
August 2002: Weardale A1 & A2 shut down.
April 2004: Tunstead A2 commenced operation.
May 2004: Tunstead A1 shut down.
March 2005: Padeswood A3 shut down.
May 2005: Padeswood A1 & A2 shut down.
July 2005: Padeswood A4 commenced operation. Ribblesdale A5 & A6 shut down.
May 2008: Northfleet A2 & A4 shut down.
September 2008: Westbury A1 and Ketton A7 shut down.
November 2008: Barrington A4 shut down.
February 2009: South Ferriby A2 temporarily ceased operation.
April 2009: Westbury A2 shut down.
February 2012: South Ferriby A2 restarted.
March 2019: South Ferriby A2 shut down.
April 2020: South Ferriby A3 shut down.